Mr Michael Casbon
Prosiectau fel Prif Ymchwiliwr
- 2.45ghz load pull characterisation (02.03.2015 - 01.04.2015)
- 30ghz load pull characterisation (02.03.2015 - 01.04.2015)
- 3.5 GHZ load pull characterisation (02.03.2015 - 01.06.2015)
- Connectorised Ka Band load pull test. (10.04.2018 - 31.03.2019)
- Fundamental only load pull of supplied GaN devices at 28GHz (02.02.2018 - 31.05.2018)
Prosiectau fel Cyd-Ymchwiliwr
- Access to Xband measurement system (Engin) (16.06.2011 - 31.08.2011)
- Analyses of MMIC behaviour (01.05.2013 - 14.09.2013)
- Characterisation of semiconductor devices fabricated at WIN semiconductors using fan diagram techniques (01.01.2013 - 30.04.2014)
- Characterization, analysis and recommendations for drain efficiency of the VHV8 platform above 1GHz (23.04.2014 - 22.10.2014)
- Device characterisation of GaN devices (01.09.2013 - 19.01.2015)