Mr Michael Casbon
Projects as PI
- 2.45ghz load pull characterisation (02/03/2015 - 01/04/2015)
- 30ghz load pull characterisation (02/03/2015 - 01/04/2015)
- 3.5 GHZ load pull characterisation (02/03/2015 - 01/06/2015)
- Connectorised Ka Band load pull test. (10/04/2018 - 31/03/2019)
- Fundamental only load pull of supplied GaN devices at 28GHz (02/02/2018 - 31/05/2018)
Projects as Co-Investigator
- Access to Xband measurement system (Engin) (16/06/2011 - 31/08/2011)
- Analyses of MMIC behaviour (01/05/2013 - 14/09/2013)
- Characterisation of semiconductor devices fabricated at WIN semiconductors using fan diagram techniques (01/01/2013 - 30/04/2014)
- Characterization, analysis and recommendations for drain efficiency of the VHV8 platform above 1GHz (23/04/2014 - 22/10/2014)
- Device characterisation of GaN devices (01/09/2013 - 19/01/2015)