Mr Michael Casbon
Projects as PI
- Harmonic load pull measurement programme (01/08/2015 - 31/01/2016)
- Ka band on wafer pulse load pull (16/07/2018 - 31/03/2019)
- Loadpull analysis of CMOS RFIC (01/02/2019 - 31/07/2019)
- Load-pull measurements pHEMT devices (25/07/2016 - 24/10/2016)
- Load pull of supplied GaN devuces at 28GHz
(12/12/2016 - 28/02/2018)
Projects as Co-Investigator
- Access to Xband measurement system (Engin) (16/06/2011 - 31/08/2011)
- Analyses of MMIC behaviour (01/05/2013 - 14/09/2013)
- Characterisation of semiconductor devices fabricated at WIN semiconductors using fan diagram techniques (01/01/2013 - 30/04/2014)
- Characterization, analysis and recommendations for drain efficiency of the VHV8 platform above 1GHz (23/04/2014 - 22/10/2014)
- Device characterisation of GaN devices (01/09/2013 - 19/01/2015)