Dr James Lambert-Smith
Prosiectau fel Prif Ymchwiliwr
- Implementing sustainability in artisanal and small-scale mining: the case of the Peixoto de Azevedo gold district, northern Brazil (01.07.2018 - 30.12.2019)
- Investigating the mineralization, alteration and temporal evolution of the Gokona Au deposit, Tanzania (15.09.2020 - 01.01.2023)
- Petrographic and mineralogical study of the Diamba Sud Au project, Senegal (08.01.2024 - 07.04.2024)
- Petrographic study of Diamba Sud Au project, Senegal (01.08.2020 - 31.10.2020)
- Petrographic study of Liberian Fe mineralisation samples (17.05.2021 - 01.12.2021)
Prosiectau fel Cyd-Ymchwiliwr
- Intracontinental deformation and ore formation (15.07.2018 - 31.03.2019)