Projects (287)
Cardiff University Schools involved in this Project
Sustainable urban housing: strengthening capacity in policy formulation and implementation in the city of Xi'an, China (31/08/2005 - 30/11/2007)
- Jones, Phillip
Annedd Residential Home - Feasibility Design/Design support for the Annedd project at Llanybydder (01/04/2006 - 31/12/2009)
- Forster, Wayne
Professional services for designs for 124 units of afffordable housing, Oxford Street, Cardiff (01/04/2006 - 30/09/2006)
- Forster, Wayne
Sustainable environment improvement in the commercial sector of Newport core - SEnvICS (01/08/2006 - 30/06/2008)
- Jones, Phillip
The Indian Temple: Production, Place and Patronage (01/09/2006 - 16/10/2010)
- Hardy, Charles
WEST (Wales Energy Sector Training) (01/09/2006 - 31/12/2007)
- Jones, Phillip
Postgraduate bursary (01/10/2006 - 30/09/2014)
- Ampatzi, Eleni
Hostel for the homeless - Beaufort House Neath (01/12/2006 - 01/12/2007)
- Forster, Wayne
The delivery of architectural services for the Eco Discovery Centre, Margam (01/03/2007 - 28/02/2008)
- Forster, Wayne
Design options for interpretation centre at Cardiff Castle (11/04/2007 - 10/10/2007)
- Forster, Wayne
DIFC lighthouse building physics (01/05/2007 - 30/04/2008)
- Jones, Phillip
Awareness and perceptions of the risks of exposure to radon in homes: A population based approach to examine the impacts of local radon policies, trust and social capital. (01/07/2007 - 31/12/2009)
- Poortinga, Wouter
Sustainable building design 1 (01/07/2007 - 01/07/2012)
- Jones, Phillip
Sustainable building design 2 (01/07/2007 - 01/07/2012)
- Jones, Phillip
HarmonAC - Harmonizing air conditioning inspection and audit procedures in tertiary building sector (01/09/2007 - 01/08/2013)
- Knight, Ian
Carbon Lite - holistic low carbon design tool (24/09/2007 - 28/02/2010)
- Jones, Phillip
Llandegla Visitor Centre - feasibility and designs (01/11/2007 - 01/02/2009)
- Forster, Wayne
Architectural services for Environmental Resource Centre, Ebbw Vale (01/12/2007 - 31/07/2010)
- Forster, Wayne
Design advice and computer modelling of Three Sisters house, Corfu (01/12/2007 - 01/06/2008)
- Jones, Phillip
Cathays Park biomass CHP feasibility study 1 (01/01/2008 - 30/06/2008)
- Jones, Phillip
Feasibility and planning designs for the Burryport Methodist Church (01/01/2008 - 31/12/2008)
- Forster, Wayne
Feasibility and planning designs for Victoria Avenue, Ebbw Vale (MMC) (01/01/2008 - 01/07/2008)
- Forster, Wayne
Layout and printing of the 'Iconography' book (01/01/2008 - 01/04/2008)
- Hardy, Charles
Preparation work to establish the Low Carbon Research Institute (01/01/2008 - 31/03/2008)
- Jones, Phillip
Low Carbon Research Institute (01/04/2008 - 31/07/2018)
- Jones, Phillip
Low Carbons Research Institute (01/04/2008 - 31/07/2018)
- Jones, Phillip
BREEAM Assessment of Buildings 5/6, Brook Office Park (01/05/2008 - 30/04/2009)
- Jones, Phillip
BREEAM Offices Assessment of Traffic Management Centre, North Wales (01/05/2008 - 30/04/2009)
- Jones, Phillip
Margam discovery Centre -Interpretation Exhibition (01/07/2008 - 31/12/2009)
- Forster, Wayne
St David's 2 Kiosks - Sketch Schemes (01/07/2008 - 01/08/2008)
- Forster, Wayne
BREEAM schools 2006 assessment for synod Inn Area School (21/07/2008 - 20/07/2009)
- Jones, Phillip
REGAIN project - environmental design advice and computer modelling (01/08/2008 - 31/01/2010)
- Jones, Phillip
Energy optimization study (10/11/2008 - 10/02/2009)
- Jones, Phillip
Carbon control and comfort: User centred control systems for comfort, carbon saving and energy (01/01/2009 - 30/09/2012)
Sustainable housing from Sitka Spruce (The SHSS House) (01/01/2009 - 31/12/2010)
- Forster, Wayne
Wind tunnel testing of Worcester Library and History Centre (05/01/2009 - 05/04/2009)
Feasibility study and consultations (up to stage c) for the Llanharan recreation field (14/01/2009 - 13/04/2009)
- Forster, Wayne
Extension designs - provision of drawings and projecrt management (26/01/2009 - 31/07/2010)
- Forster, Wayne
Carmarthen homes standard health impact scoping study (30/01/2009 - 29/07/2009)
- Poortinga, Wouter
Margam Interpretation Exhibition - Design and installation (16/02/2009 - 16/05/2009)
- Forster, Wayne
Supergen: Delivery of sustainalbe hydrogen (01/04/2009 - 31/03/2013)
- Eames, Malcolm
Radyr Farm renewables feasibility study (01/05/2009 - 31/05/2009)
- Jones, Phillip
Carbon Footprint Tool (01/06/2009 - 01/09/2010)
- Jones, Phillip
Delivering low carbon buildings Cymru - from policy to practice (Convergence) (01/06/2009 - 30/06/2012)
- Jones, Phillip
Delivering low carbon buildings Cymru - from policy to practice (Non Convergence) (01/06/2009 - 30/06/2012)
- Jones, Phillip
Options appraisal for "The Field Project" for vision 21 (30/06/2009 - 31/07/2009)
- Forster, Wayne
Determining a green building solution for the community sector (01/07/2009 - 31/10/2009)
LCRI - Low Carbon Built Environment - WP6 UWIC budget - ERDF Structural funds project (01/07/2009 - 31/07/2016)
- Jones, Phillip
Prysor hatchery, Trawsfynydd (01/07/2009 - 31/03/2011)
- Forster, Wayne
Roath basin charrette documentation (01/07/2009 - 30/09/2009)
- Forster, Wayne