Prosiectau (130)
Cardiff University Schools involved in this Project
Towards a Semantic Web of Things for Smart Cities (01.07.2013 - 30.06.2017)
- Howell, Shaun
Taffs Well Thermal Spring - Heat recovery (14.10.2019 - 30.03.2020)
- Thomas, Hywel
Technical experiments and investigations to generate mist and spray (03.10.2013 - 23.11.2014)
- Bowen, Philip
Technology development towards sustainable marine current energy harvesting for coastal communities in Mexico (24.02.2020 - 17.03.2023)
- O'Doherty, Tim
Technology platform evangelization and implementation of graphical system design in the context of improving science and engineering practical education and accelerating advanced research (02.02.2015 - 31.03.2017)
- Benedikt, Johannes
Technology transformation to support flexible and resilient local energy systems (01.04.2020 - 30.09.2023)
- Robson, Stephen
Teme nature based flood solutions, field monitoring and modelling study (10.02.2023 - 28.02.2025)
- Wilson, Catherine
Tensile testing (05.11.2018 - 26.11.2018)
- Davies, Aled
Tensile testing of cast aluminium (10.05.2010 - 09.06.2010)
- Holford, KAREN
Tensile testing of dumbbell specimens (01.07.2012 - 31.08.2012)
- Pullin, Rhys
Tensile testing of fibre optic cables for Rural Technologies Wales (04.04.2019 - 31.05.2019)
- Mahdi, Talib
Tensile testing of fibre optic cables for Rural Technologies Wales (25.01.2021 - 15.02.2021)
- Mahdi, Talib
Tensile testing of steel samples (25.09.2010 - 01.10.2010)
- Evans, Samuel
Test additively manufactured machine windings (08.01.2024 - 30.04.2024)
- Clark, David
Testing and development of a novel water treatment technology for the removal of dissolved contaminants (01.08.2009 - 31.10.2009)
Testing of a novel dummy for menthol oil removal under vacuum (20.04.2011 - 19.06.2011)
- Holford, KAREN
Testing of a prototype aerospace component for AMRC (01.10.2020 - 31.03.2021)
- Clark, David
Testing of a Wenkel engine for hydrogen/ammonia compatibility (01.09.2023 - 30.04.2024)
- Navaratne, Rukshan
Testing of Bottles (04.04.2011 - 10.04.2011)
- Pullin, Rhys
Testing of injector materials (30.01.2023 - 14.04.2023)
- Navaratne, Rukshan
Testing of leadscrew to determine the magnetic permeability (14.10.2010 - 13.04.2011)
- Anderson, Philip
Testing of novel glass (21.09.2009 - 21.10.2009)
Testing of rucksacks (01.08.2012 - 31.08.2012)
- Pullin, Rhys
Testing of structural brackets (02.07.2013 - 01.09.2013)
- Pullin, Rhys
Testing Silo Stiffner Systems (01.04.2011 - 30.04.2011)
- Pullin, Rhys
Test of multi-terminal VSC HVDC control strategies by means of an analogue testing rig (01.02.2012 - 31.07.2012)
- Liang, Jun
Test Project 2 - Discovery Phase of deployment of CUSP on Reading Station for Network Rail (17.09.2021 - 27.04.2022)
- Rezgui, Yacine
TETCRETE 2.0 – A comparison of polymers in tetrahedral reinforcement of concrete (01.06.2021 - 28.02.2022)
- Maddalena, Riccardo
Textured insulators (01.09.2017 - 30.06.2024)
- Haddad, Manu
Textured insulators for overhead lines and substations (19.11.2008 - 30.04.2012)
- Haddad, Manu
The Active Building Centre. (03.09.2018 - 30.09.2022)
- Wu, Jianzhong
The analysis of mechanic factors and response in tumour microenvironment of metastasis (31.03.2018 - 31.12.2022)
- Yang, Chris
The anatomical effects of rotation on the cervical and lumbar spine: An MRI study (02.01.2014 - 11.07.2014)
- Yang, Chris
The answer lies in the soil: Environmental resilience in rural Wales (01.03.2021 - 30.11.2021)
- Follett, Elizabeth
The characterisation of 10 X-band gallium nitride devices (14.05.2011 - 30.09.2011)
- Tasker, Paul
The clinical validation of a new mathematical tool to diagnose and classify normal, pathalogical TKR knee function (01.04.2009 - 31.03.2012)
- Holt, Cathy
The corrosion and cracking mechanisms of assembled concrete structures exposed to a dry and cold sulfate environment (01.10.2021 - 31.08.2025)
- Zhu, Hanxing
The design and testing of refuse fuel briquettes to enable hydrogen and energy recovery by gasification (21.02.2005 - 31.08.2007)
The development of a distributed ledger technology (DLT) micro-grid management platform (01.12.2018 - 30.06.2019)
- Wu, Jianzhong
The development of self-sensing, self-healing concrete structures and the quantification of their value in the context of enhancing the delivery of a major highway project (01.04.2019 - 29.09.2020)
- Gardner, Diane
The effect of carbon dioxide degassing on reducing reagent consumption during water treatment (01.04.2011 - 31.10.2011)
- Sapsford, Devin
The effects of realistic tidal flows on the performance and structural integrity of tidal stream turbines (01.07.2012 - 30.09.2015)
- O'Doherty, Tim
The European research infrastructure for thermochemical biomass conversion (BRISK) (01.10.2011 - 30.09.2015)
- Bowen, Philip
The EU Smart Building Innovation Platform — SMARTBUILT4EU (01.10.2020 - 31.03.2023)
- Rezgui, Yacine
The evolution of the boundary between turbulent and irrotational flow in spilling breaking waves (14.12.2020 - 13.12.2024)
- Xie, Zhihua
The functional and biological assessment of a novel orthopaedic implant material for the treatment of focal cartilage lesions (01.04.2014 - 31.07.2019)
- Holt, Cathy
The holy grail of diabetes management: Bloodless, painless and accurate microwave continuous blood glucose monitor (01.05.2017 - 30.06.2021)
- Choi, Heungjae
The impact of planting floodplain and riparian woodland, including energy plantations in middle to upper catchment reaches on downstream flood management (01.10.2010 - 31.03.2014)
- Wilson, Catherine
The implementation of economic modular intelligent controllers for localised data acquisition and analysis to support operation and management strategies in environmental engineering systems (06.11.2006 - 05.11.2009)
- Grosvenor, Roger
The implementation of economic modular intelligent process controllers for localised data acquisition and analysis to support operation and management strategies in environmental engineering systems (06.11.2006 - 05.11.2009)
- Grosvenor, Roger
The micromechanics of interfaces. A symposium in honor of Professor Leon Keer (11.07.2010 - 24.07.2010)
- Borodich, Feodor
The National Grid Transco High Voltage Research Centre (01.01.2005 - 31.12.2010)
- Haddad, Manu
The National Grid Transco High Voltage Research Centre (01.01.2011 - 31.12.2013)
- Haddad, Manu
The need for new sources of flexibility (01.05.2019 - 04.10.2024)
- Wu, Jianzhong
The project requires measurement and analysis of a range of novel wire wound cores in orfder to assess their pereformance as a function of magnetising frequency and compare them to cores made in a traditional fashion (01.06.2009 - 30.09.2009)
- Anderson, Philip
The prospect of using mm-wave communications for 5G radio access (07.11.2018 - 06.11.2019)
- Quaglia, Roberto
The relationship between alignment, function and loading in total knee replacement: In-vivo analysis of a unique patient population (01.08.2011 - 31.07.2012)
- Holt, Cathy
The renewably powered railway: renewable railway power network (01.11.2021 - 31.03.2023)
- Cipcigan, Liana
Thermal conductivity measurement of 3 different aqueous suspensions using a Thermtest MP2 system and THW-L3 sensor. Three repeat measurements will be made for each suspension at 40degC. (01.02.2022 - 31.03.2022)
- Eaton, Mark
Thermal evolution monitoring in Oikiluoto (15.04.2013 - 31.12.2013)
- Thomas, Hywel
Thermal inverse modelling and Olkiluoto monitoring programme (15.01.2014 - 31.12.2014)
- Thomas, Hywel
Thermal simulation of heat flows within heart pump bearing (01.09.2016 - 31.10.2016)
- Clarke, Alastair
Thermoelectric heat recovery from low temperature exhausts of steel process (01.07.2013 - 30.06.2016)
- Gao, Gao Min
Thermogravimetric analysis of coal samples (15.05.2017 - 14.06.2017)
- Steer, Julian
Thermogravimetric analysis of coal samples 2018 (01.04.2018 - 25.05.2018)
- Steer, Julian
THERMOMAG - Nanostructured thermoelectrics based on Mg2Si (01.05.2011 - 31.10.2014)
- Gao, Gao Min
Thermomechanical concrete durability (01.01.2010 - 31.12.2010)
- Bordas, Stephane
Thermophoretic particle loss understanding at high temperature (01.12.2016 - 31.10.2017)
- Crayford, Andrew
The role of surface chemistry and material properties on the fate of coals and coal chars during blast furnace coal injection (01.04.2016 - 30.09.2018)
- Steer, Julian
The role of technology and lifestyle interventions in Osteoarthritis (01.10.2018 - 30.09.2021)
- Holt, Cathy
The role of the St David's Day group of universities in the future of community and regional regeneration in Wales (01.10.2011 - 30.09.2012)
- Pullin, Rhys
The SAFEST Review: The shock-Absorbing Flooring Effectiveness SysTematic Review including older adults and staff in care settings (01.02.2019 - 31.03.2020)
- Keenan, Bethany
The Seagreen 1A offshore wind project (30.10.2023 - 29.11.2023)
- Anderson, Philip
The use of novel materials to enhance motorcyclist safety in developing countries (01.11.2015 - 31.10.2017)
- Theobald, Peter
The use of rawwater M3 SF6 leak mitigation (10.06.2022 - 31.03.2024)
- Haddad, Manu
The use of Rawwater M3 SF6 leak mitigation (21.08.2023 - 30.01.2024)
- Haddad, Manu
Three batches PFA - Mudstone samples: Kd testing for ARUP (01.07.2013 - 31.12.2013)
- Sapsford, Devin
Tidal array cost reduction: testing a removable nacelle design for deltastream technology (01.05.2016 - 30.04.2017)
- O'Doherty, Tim
Tidal energy for sustainable village electricity supply (01.04.2017 - 31.03.2020)
- O'Doherty, Tim
TidAl Range schemes as configurable Grid-scale Energy sTorage facilities (TARGET) (01.01.2023 - 31.12.2024)
- Ahmadian, Reza
Time-frequency based particle filtering for mental fatigue analysis (01.07.2008 - 01.07.2011)
Tissue hydration during pre-parturitional cervical remodelling (01.10.2012 - 28.02.2014)
- Porch, Adrian
To apply simulation, intelligent optimisation and fit manufacturing methods to engine manufacture, inspection and assembly, in order to investigate the impact of factors on production (01.09.2010 - 14.12.2013)
- Prickett, Paul
To conduct a technical optimization programme of a proprietary leach column and to investigate the applicability of the associated processes within the minerals industry (01.09.2008 - 31.08.2010)
To determine the elemental composition, thickness and structure of new materials on a microscopic scale (01.10.2018 - 30.04.2021)
- Bennett, Anthony
To develop a BIM (Building Information Modelling) based data fusion digital twin, which can collect, clean, validate, analyse and visualise data from different perspectives (11.04.2022 - 10.04.2025)
- Li, Haijiang
To develop a compact and modular AC-DC power converter to replace the bulky AC-DC converter in the current PowerCore (01.05.2018 - 09.07.2021)
- Ming, Wenlong
To develop a high-efficiency, flexible 2 KW solid-state microwavepower delivery system operating at 2.4-2.5 GHz to replace the inflexible and inefficient magnetron-based systems (01.11.2023 - 31.01.2026)
- Lees, Jonny
To develop and implement a design methodology for textile tribological materials based upon first principle research, and utilise the methodology in design of new materials (01.03.2013 - 28.02.2015)
- Evans, Henry
To develop and market a state-of-the-art software module for non-linear earthquake analysis of civil engineering structures (27.12.2011 - 25.03.2015)
- Jefferson, Anthony
To develop and market new state-of-the-art facilities in the finite element program LUSAS for soil-structure interaction problems (04.02.2013 - 30.06.2016)
- Jefferson, Anthony
To develop an innovative, industry leading design and optimisation methodology and tool for the design and development of new trailer upper structure products (01.09.2016 - 31.08.2018)
- Clarke, Alastair
To develop a thermal battery-based solution for district cooling applications capable of shifting cooling loads to periods of the day with less cooling demand (28.10.2019 - 27.04.2022)
- Jenkins, Nicholas
To develop autonomous load cells through the development of power management electronics, wireless communication and energy harvesting technologies for a wide range of monitoring applications (16.06.2014 - 30.06.2016)
- Lees, Jonny
To develop company experitse and procedures for design that can accelerate it's product development to maintain it's growth rate and profitability (15.02.2010 - 14.02.2012)
- Kwan, Alan
To develop digital twins-based Asset Management System to effectively manage the batteries and power electronics converters in the VIRTUE so as to protect system lifetime and increase system reliability (10.08.2022 - 21.03.2026)
- Ming, Wenlong
To develop Ford's capacity in resource efficiency and environmental performance through improvements in waste management and effluent treatment (01.09.2010 - 31.08.2012)
- Sapsford, Devin
To develop novel composite materials for high strength, light weight, low friction bearings for aerospace applications and embed the capability to develop new materials (01.12.2010 - 13.02.2014)
- Evans, Samuel
To develop the capability to design improved protection and earthing systems that will ensure greater infrastructure resilience (05.01.2021 - 04.10.2023)
- Haddad, Manu
-
- Pullin, Rhys